中文字幕Aⅴ人妻一区二区,国产精品亚洲视频,99精品视频在线免费观看,成人午夜福利视频,亚洲第一区se,性色做爰片在线观看ww,制服丝袜中文字幕无码自拍,A片免费观看一区二区三一区

?
?
Anchor Drilling machine soil conservation
writer:ld-driller | time:2020-09-03 16:05:32

Anchor Drilling machine of Qianshan machinery after 7~8 days of soil cable anchor cable grouting maintenance, when the anchor strength is greater than 15Mpa and not less than 75% of the design strength, after the bearing capacity is confirmed, install the enclosure on the supporting structure, conduct prestressed tension. The Tensioning equipment is the same as the prestressed structure, and the prestressed value is 75% ~ 80% of the designed anchoring force.

Note the following matters during tension:

The tension should be separated by one; Before the formal tension of anchor cable, 10% ~ 20% of the designed tension should be taken, and cable anchor should be pre-tensioned for 1~2 times; The formal tension of anchor cable should be graded loading, after each level of loading, the load should be stable for 3min, and the elongation value should be recorded; Load step by step until 80% of the designed anchoring force, and the last level of loading should be stable for 5min, and the elongation value should be recorded; when there is no obvious attenuation of the tension bar, the tension bar can be locked; After the design tension is completed for a period of time, depending on the attenuation of the tension bar, some cable anchor can be appropriately overtensioned.